Installation of GRP pipes – Zagreb

Our Activities
Works on the project “Construction of the Basic Supply System – Regional Water Supply System of Zagreb County – Zagreb East.”
Fabrication and installation of special GRP pipe supports DN800.
Installation of GRP pipes DN800 – delivery of pipes to the microtunneling shaft, lowering the pipes into the shaft, pulling the pipes into the microtunnel, connecting the pipes, and checking water tightness – microtunnel under the Sava River.
